Kehl St Fall Build 2022
Habitat for Humanity: Kitchener Waterloo Ontario Canada
Monday, March 9, 2015
vapour barrier, inspection than drywall
filling in the cracks
the last window
and finally in
good construction
finally a bit of sweat equity
moving the drywall
making room for the concrete truck to pour the floors
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment