Kehl St Fall Build 2022
Habitat for Humanity: Kitchener Waterloo Ontario Canada
Monday, January 16, 2017
roof finished on Saturday
last of the three floor poured
finished floor
stair well wall
bulkheads
start of the stair well wall unit 1