Kehl St Fall Build 2022
Habitat for Humanity: Kitchener Waterloo Ontario Canada
Wednesday, September 24, 2014
laying out the next wall
connecting the pipes
morning briefing
doorway going in place
cutting the window casing
today's group
getting ready for the siding
the sweeping crew
vapour barrier crew
Tuesday, September 23, 2014
building the walls
putting up the vapour barrier
pluming is continuing
services continuing
the start of the window trim
Monday, September 22, 2014
draining the pond
getting the first wall ready
the next pond
wall up
today's group from Manulife
last wall of the day
Thursday, September 18, 2014
services continuing
windows and doors are here
working on the dormers
caulking the basement membrane
installing the windows
sliding doors going in
windows and sliding doors are installed
Wednesday, September 17, 2014
the start of the hilti gun
changing the stairway
putting in the vents
repairing the drywall
a little basement excavation
shingling is done
next load of lumber for the last two units
the amazing team from TD What a great days work
Tuesday, September 16, 2014
a day of moving drywall
continuing on with the services
one dormer shingled
finishing the dormer
shingling has started
just about the end of the drywall